Our Auditorium - Chairs have been restored, and air conditioning vents have been placed under the seats.
Our Auditorium - Looking out from Stage area
Main Floor Restrooms - Left Side for Girls, Right Side for Boys, Wash area shown is unisex with no separation...
Kindergarten on Lower Level - no lockers, just cubies All the Terrazzo floors are being cleaned and polished and all the hardwood floors are being sanded and coated to their original beauty.
One of three archways from main entrance, they are being refinished and moved back 15 feet for a security office being built
Classrooms - Lower Level
All rooms have restrooms...
Old Boilers staying, too expensive to move.
New Boilers, much smaller and more efficient. They are in the old coal bin.
Air Conditioning Unit for the Auditorium
Our New Cafeteria
Our New Cafeteria - Kitchen and Serving Line
Our granite steps have been numbered and set aside. A new foundation is going to be poured and the steps reset as they originally were.
Our granite steps have been numbered and set aside. A new foundation is going to be poured and the steps reset as they originally were.